Utilization: a daily target, not a monthly ratio

In services, everyone feels fully booked. How much of it gets billed is decided during the day, not at month-end. How to measure utilization properly and how to steer it.

Lukas Ebner
Lukas EbnerCo-Founder Leadtime
November 10, 2026 8 min read
In short

Utilization is three numbers: logged, billable and actually billed. The gap between them mostly comes from hours that get reconstructed after the fact. What helps is a daily target for billable time that every employee can see all day, combined with real-time time tracking. For an IT services firm with 25 people, I recommend at least 50% billable time.

The problem in services is not that people work too little. Everyone feels fully booked, all the time. The question is how much of that day ends up on an invoice.

The industry as a whole does not look good here. According to SPI Research’s annual benchmark, average billable utilization at professional services firms was 66.4% in 2025, the lowest since the survey began.1 I think that has less to do with a lack of work than with how hours are recorded and managed.

Three ratios you need to keep apart

All three divide by the same base, available hours: contracted time minus public holidays, leave, sickness and training. What differs is the numerator.

RatioNumeratorAnswers the question
Logged utilizationHours on client projectsIs the team busy?
Billable ratioHours the contract makes chargeableIs the work sold?
Billed ratioHours that appear on an invoiceDoes the money arrive?

Most planning tools show the first number. Your margin depends on the third.

Where the hours disappear

Between “billable” and “actually billed”, most hours vanish because time is recorded sloppily. Days at a service firm are extremely fragmented. You get interrupted a thousand times: a client calls, someone on the team has a quick question, an urgent bug comes in.

If you reconstruct your time in the evening, or on Friday, those fragments are exactly what you lose. The 15 minutes of advice on the phone never show up, because they sat between two larger blocks. At the end of the week the entry reads “Project X, 6 hours”, and nobody knows anymore whether any of it was billable.

That is why Leadtime lets you pause the running timer at any point and start a second one. When the phone rings, those 15 minutes run on their own timer for the client who is calling. Then you carry on with the first. It sounds like a detail, but this is exactly where the missing hours come from.

A target per day instead of a ratio per month

At some point we started giving our employees a target for billable time per day. For example: of 8 working hours, 4 should be billable. We built this concept into Leadtime as well. Everyone sees a time ring filling up during the day and can work toward hitting the target.

The difference from the monthly report is timing. A ratio that appears at month-end in the management meeting can no longer be influenced. A daily target is something every employee can still hit today. It combines two things: setting yourself a target and measuring constantly in real time. Together they work; either one alone does not.

Which target is the right one

85% billable time is absolutely worth aiming for in some roles, and not in others. A developer can reach 85% comfortably. For someone doing creative work, a target like that probably produces nonsense. It is pointless pressure, because the work does not function that way. The target has to fit the work.

For an IT services firm with 25 people, I recommend at least 50% billable time on average. You have to balance that figure against your own hourly rate. A worked example shows how closely the two are linked.

Worked example, per person per yearValue
Available hours (210 days × 8 h)1,680 h
Hourly rate€110
Fully loaded cost (salary, payroll costs, share of rent and admin)€85,000
Billed ratio at which the person covers their cost: €85,000 ÷ (€110 × 1,680 h)46%

Below 50%, at this rate, a person barely earns more than they cost. Every point above it is contribution margin. With 25 people, a single percentage point is worth 420 hours a year, or about €46,000 in revenue at €110, from a team that is already there.

With 25 people, one point of billable time is worth about €46,000 a year.

Part of the gap is routine: collecting hours, filling in descriptions, writing invoices. Leadtime, the platform for IT service firms, agencies and consultancies, makes exactly that routine up to ten times faster. That is a model. You will find the method and can use your own numbers in the calculator.

Four numbers for the weekly meeting

NumberSourceWho acts when it slips
PlannedCapacity planHead of Delivery
LoggedReal-time time trackingEveryone, via the daily target
BillableLogged, filtered by contract and budgetProject lead, with the client
BilledThis week’s invoicesFinance, management

What tells you most is the distance between two neighbouring numbers. If planned and logged drift apart, the plan is wrong. If billable and billed drift apart, money is being left on the table.

Frequently asked questions

What is the difference between utilization and billable ratio?

Utilization counts all hours on client projects. The billable ratio counts only the hours the contract allows you to charge. The difference is goodwill, rework, internal coordination booked to client projects and fixed-price overruns.

What billable ratio is realistic for an IT services firm?

It depends on the role. A developer can reach 85%; for creative work, a target like that only creates pressure. For a team of 25, I consider at least 50% on average the floor, set against your own hourly rate.

Do leave and sickness count as available hours?

No. Available hours are what remains after public holidays, leave, sickness and training. Otherwise every ratio looks bad in summer and good in November.

How often should utilization be measured?

Daily for each employee, through a daily target they can see themselves. Weekly for the team. The monthly report comes too late to change anything.

Sources

  1. SPI Research: Professional Services Maturity Benchmark 2026, 2025 data, 509 organizations; average billable utilization 66.4%. As reported by Certinia and Deltek, 2026.
  2. Worked example: 25 people, 1,680 available hours, €110 hourly rate, €85,000 fully loaded cost per person. All values are illustrative assumptions.
  3. Factor ten for routine work: Leadtime model, assumptions and method in the calculator.
With your numbers

How much routine is in your week?

The calculator shows how much time agents, one continuous process and automation free up, and what that means for EBIT. A model, every assumption visible.

Open the calculator
30 minutes

Rather look at it together?

We go through your numbers with you and show where Leadtime makes them visible.

Book a call
About the author
Lukas Ebner
Lukas Ebner

Lukas Ebner co-founded the digital agency eins+null in 2009 and ran it for 13 years, growing it to about 50 people and more than 1,000 projects before selling it in 2022. Leadtime grew out of the internal tool he built there to keep projects, time and invoices together. He writes about how service firms get more done with agents and one continuous process, from his own practice.